PID Testing of Insulators

To keep the transmission line or Substation in healthy condition it is utmost essential that all the insulator Strings are in extremely good condition. The above detection of insulator strings Scanner detection is based on the induction effect. The Scanner is slid over the insulators at a definite distance.

 

Transmission lines or Sub-Stations located near polluted areas having Sulphur, salt, ash, conductive dust, etc face serious problem of deposition of this on porcelain insulators. Dust being conductive reduces the creepage path. Onset of winter when we observe Dew formation Voltage dips, tripping of EHV lines is a common phenomenon.

 

Deposition of sulphar, salt, ash, conductive dust, etc makes Insulator string weakest in EHV System which eventually produces flashover of insulator string. These un-warranted tripping
produces heavy voltage surges and severe mechanical stress on system. The recurrent tripping of this nature may result in major break-down. To keep the system in perfectly healthy condition
i.e having No Break-downs the only solution is PID testing and replacement of faulty insulator in Hot line maintenance.

For checking the healthiness of insulator strings "Positron insulator tester" is used. The Insulator tester measures the AC electric field surrounding porcelain and composite insulators. This tester slid over the insulators at a definite distance. Due to induction across individual insulators the corresponding voltage induced in scanner is monitored. Electric field is proportional to the voltage across an insulator and drops at a defect location. The electric field is read and stored on each insulator. Graph of induced voltages of across the insulators discs show the health of individual insulator.

Due to PID testing, the detection of punctured insulators is possible easily and without gettingshut down on line. The defective insulators/ strings can be replaced in live line by Hot linemaintenance team. This will increase the healthiness of the line and avoids breakdown/shutdown of line.

Key Completed Projects

MPPGCL

Project Name - Work order for condition monitoring / online PID test of insulator strings installed in 220 kV switchyard at ATPS MPPCGL Chachai

Scope - online PID testing of disc insulator by Porcelain Insulator tester (POSITRON) of 220 kV Switchyard - 629 strings

More Info

MSETCL

Project Name - Work of annual rate contract for insulator testing by POSITRON method and replacement of faulty insulators in Hot line conditions of various 400/220/132kV and 100 kV lines and substations under EHV CC (O&M) Zone, Pune.

Scope - PID testing as per requirement

More Info

MPPTCL

Project Name - PID testing/scanning of Single/Double Suspension & Double Tension Insulator string of 400 KV Raigarh-Sardar Sarovar (SSP) DCDS line on both ckt, 400 kV Nagda-Raigarh DCDS line on both ckt, 220 kV Nagda-Nemmuch DCDS line from loc.no 02 to 403 of both ckt

Scope - PID testing as per requirement

More Info

Powergrid

Project Name - PID of 400 kV Balangir-Angul and 400 kV Balangir-Jeypore line under jurisdiction of Powergrid, Balangir Sub-station

Scope - 220 KV Bay - 2 (Nerul)
220 KV Bay- 2 (Sea Wood)
220 KV, 1000 sq.mm. EHV UG Cable work- 1.9 D/C Route Km.

More Info

MPPTCL

Project Name - Suspension/Tension Insulator string of 220 KV Bina-Gwalior DCDS line from loc.no 400 to 609 on both ckt

Scope - PID testing on total 209 locations

More Info

MSETCL

Project Name - work of detection of faulty insulators & rectification of the same of various 132/220/400 kV lines/substations under Trans O & M Circle, Pune.

Scope - Total insulator strings on 220 kV are - 2117 No.s Total insulator strings on 220 kV are - 912 No.s

More Info